DESIGN
← All projects
Central kitchens & takeawayFood Factory LicenceSiu Mei & Lo Mei Permit

District
Kwun Tong
Area
2,200 sq ft
Year
2024
Kwun Tong Central Kitchen

A central kitchen supplying five branches. Industrial-building rules put ventilation, fire safety and drainage under extra scrutiny.

Scope

  • Site assessment
  • Design
  • Fit-out
  • Licensing
  • Fire safety
  • Furniture

The challenge

  • Industrial premises had to qualify for food factory use
  • Heavy cooking equipment needed high-volume extraction and fume treatment
  • Raw/cooked separation and grease trap capacity

What we did

  • One-way production flow with full raw/cooked separation
  • Designed extraction with electrostatic fume treatment, integrated with fire requirements
  • Grease trap re-sized to EPD standards

Outcome

5
Branches supplied
2,200
Sq ft production floor
1
Inspection round to approval
After
Before
BeforeAfter

Drag to compare: before / after

— Operations Manager, central kitchen

Next project

Tsim Sha Tsui Cocktail Bar